Rural City of Wangaratta has confirmed its staged exit from direct Aged Care services.
As part of our upgrade to Connect Wangaratta, the site will be down from Saturday 10 October to Tuesday 13 October.
We have over 300 bridges and major culvers in the region. Following extensive inspection, we have implemented load limits of 39 bridges for the safety of residents and visitors.
Ongoing bridge replacement and/or strengthening has reduced the number of load limited bridges in the municipality.