Facilities Building Renewal Projects

Facilities Building Renewal  (1).png

Current Projects:

Milawa Hall Public Toilets

Construction of two new public toilets for the Milawa Township located at the front of the Milawa Hall.

Works commenced late July 2025 and are due to be complete by September 2025.

Access to the existing public toilet will remain open during construction.

Existing Toilet Block:

IMG_9082.jpg

Works underway July 2025:

Attachment.jpg

Attachment 1.jpg

Apex Park Pavilion Refurbishment

The Pavilion at Apex Park in Clements Street, Wangaratta was refurbished in April 2025.

The timber work was painted with a special effects paint that will produce a rusty look finish over time.

20250408_113457.jpg20250408_113450.jpg

20250408_113517.jpg

Bowman's Murmungee Hall

Installation of new accessible concrete paths and updating accessible access in the hall.

Replacement of facias and weathered double doors on west side of the Hall.

This project is now complete as of May 2025.

Photos: April 2025

Bowmans Murmungee new sliding door.jpg

 

Photos: March 2025

20241122_065834.jpg

 

IMG_4431 (1).JPGIMG_4086.JPG

Photos: 17 October 2024

Murmungee front.jpgmurmungee 2.jpg

murmungee.jpgMurmungee 3.jpg

 

North Wangaratta Recreation Reserve Toilet Block

Existing toilet block has been demolished and a new accessible toilet block was constructed and installed.

This Project is complete as of May 2025.

IMG_4583.jpg

IMG_4582.jpg

Photos May 2025

IMG_4468.JPG

IMG_4168.JPGIMG_4305.JPG

IMG_4171.JPGIMG_4307.JPG

IMG_4170.JPGTCUH9064.JPG

 

 

Wangaratta Public Cemetery - Toilets

Existing toilet block was demolished and a new accessible and ambulant toilet block has been constructed and installed.

Image.jpg

IMG_3651.JPG

IMG_E3174.JPGUFQO2913.JPG

IMG_3567.JPG

IMG_3605.JPG

Wangaratta Performing Arts & Convention Centre

Wangaratta Performing Arts & Convention Centre:

  • Timber floor renewal in Memorial Hall & the Green Room.

IMG_2790.JPGIMG_2791.JPG

IMG_2789.JPG IMG_2788.JPG

  • Upper Foyer with new stainless steel tactiles and polished concrete in foyer.

WSAC Squash Courts

Six courts at the Wangaratta Sports & Aquatic Centre (WSAC) are being sanded and lines repainted as part of renewal works at WSAC over the last couple of years. New box gutters and a newly integrated louvre system, full ceiling and wall repaint have all been completed.

Before works completed:

Old squash court floor.jpg

After works completed:

New floor squash court 2.jpg

WSAC Group Fitness Room

Renewal works have been completed this financial year in the Group Fitness Room at Wangaratta Sports & Aquatic Centre (WSAC). Works included replacement of roof, ceiling, HVAC system, and resealing of the floors.

Before photos of Group Fitness Floor:

Old group fitness room.jpgOld group fitness room 2.jpg

Past Projects: